Hi SAP GURU's,
When i creating production order, after releasing when i am saving the order it will show an error that is (No valuation variant found 1003) like this it is showing one dialog box, and when i see log It is showing below error.
Amount in calculation base 1004 exceeds maximum value
Message no. KA387
Diagnosis
For a base line in the costing sheet, the system has calculated an amount for calculation base 1004 which has more than 11 digits. However, only amounts with a maximum of 11 digits can be processed for each base line, such as $999,999,999.99 USD or 99,999,999,999 lire.
System Response
The overhead is not applied.
Procedure
Subdivide the cost element intervals in the calculation bases so that the amounts calculated remain under this limit.
Example:
The following amounts are posted to the objects for which overhead is to be calculated:
Cost element Amount
400000 999,999,999.99 USD
400010 999,999,999.99 USD
WRONG procedure:
You have defined the following calculation base:
Calculation base B000:
From CE To CE
400000 400010
You use the following costing sheet:
Costing sheet: A00000
Line Base Overhead Name From To line CR
10 B000 Material 0 0
20 C000 OH material 10 0 E01
CORRECT procedure:
Define the following calculation bases:
Calculation base X001:
From CE To CE
400000 400000
Calculation base X002:
From CE To CE
400010 400010
Define the following costing sheet:
Costing sheet: Y00001
Line Base Overhead Name From To line CR
10 X001 Material 1 0 0
15 X002 Material 2 0 0
20 C000 OH material 10 15 E01
PLEASE GUYS HELP ME IN THIS ISSUE..
Regards
sunil gupta